News

Installation of SUPROMED equipement in the Tunisian demosite, Sidi bouzid 22 January 2021 Featured
27 Jan 2021
(2 votes)

Installation of SUPROMED equipement in the Tunisian demosite, Sidi bouzid 22 January 2021

On 22 January 2021 an event was organised by the NGC team for the implementation of the equipment to measure soil moisture (Drill & Drop) and pressure transducer in Sidi Bouzid demo-sites (SUPROMED plot, Leader plot and Average plot). This task was carried out with the technical assistance of the company GLOBETECH (representative of Pessl Instruments in Tunisia).

Read 11176 times Last modified on Wednesday, 27 January 2021 12:34

Disclaimer SuproMed

SUPROMED is part of the PRIMA programme supported by the European Union.

Calendar

Mon Tue Wed Thu Fri Sat Sun
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31